Aftermarket

Keep your plant running. Avoid unnecessary outages.

Møre Trafo offers service and maintenance tailored to your installation’s age, load, and criticality. Our specialists know the products from the inside – and document everything along the way. Preventive maintenance is the cheapest insurance you can get for a transformer installation.

SEO

Service Services at Møre Trafo

Oil Analysis and DGA

We take oil samples for laboratory analysis to assess the condition of the insulating oil: moisture content, acid number, and breakdown voltage. Dissolved gas analysis (DGA) also gives early warning of developing faults – such as overheating or partial discharges – long before they can turn into failures. DGA can indicate the type of fault; electrical measurements can locate it.

Visual Inspection and Condition Assessment

Review of the transformer’s external condition: seals, surface treatment, ventilation, cooling, connections, and safety components. We assess the condition and give a concrete recommendation for further actions.

Inspection of bushings and tap changer

Bushings and tap changers are among the components most exposed to failure. We check their condition, uncover wear and recommend actions – whether that means cleaning, adjustment or replacement.

Inspection of Instrumentation and Measuring Equipment

Inspection of temperature gauges, oil level gauges, pressure relief valve, and other measuring and protection equipment.

Filtering and Replacement of Insulating Fluid

Where the analysis shows it, we filter the oil to remove moisture and contaminants, or we replace the insulating liquid completely. Drying moist paper insulation is a concrete measure where we know that correct execution can significantly extend service life. Used insulating liquid is handled in an environmentally sound way.

Cooling Capacity and Thermal Monitoring

In many cases, increased cooling capacity is a simple and effective way to reduce operating temperature – and extend insulation lifetime. We assess your existing cooling solution and recommend measures where relevant.

Documentation and History

We document every service visit in writing. Over time, we build a history for your installation – giving you a better basis for maintenance planning, investment decisions, and regulatory compliance.

What Actually Fails – And Why It Matters

International failure statistics for transformers show a clear pattern: almost all serious failures occur in three components – windings, bushings, and tap changers. Failures in these three often cause downtime, because they require extensive repair and because material lead times vary.

Tougher Operating Conditions

Transformers face ever tougher operating conditions and are getting harder and harder to replace.

Critical Components

The three components that cause most failures are windings, bushings, and tap changers.

Preventive inspection

Early detection through regular condition monitoring is the most effective way to avoid long downtime.

Service Locations

We provide service from two locations: Sykkylven in Sunnmøre (Western and Central Norway) and Kløfta by Oslo Airport Gardermoen (Eastern and Southern Norway). Both have permanent staff and fully equipped service teams.

SEO

Service Center Sykkylven

Need help, service or a service agreement?

SEO

Service Center Kløfta

Need help, service, or a service agreement?

Contact Customer Service and Aftermarket

Service and Maintenance | Møre Trafo