Aftermarket

Keep your facility running. Avoid unnecessary downtime.

Møre Trafo offers service and maintenance tailored to your system’s age, load, and criticality. Our specialists know the products inside and out—and document every step. Preventive maintenance is the most affordable insurance you can get for a transformer system.

SEO

Services at Møre Trafo

SEO

Oil Analysis and DGA

We take oil samples for laboratory analysis to assess the condition of the insulating oil, including moisture content, acid number, and breakdown voltage. Dissolved gas analysis (DGA) also provides early warning of developing faults—such as overheating or partial discharges—long before they can lead to failure. DGA can indicate the type of fault, while electrical measurements can locate it.

SEO

Visual Inspection and Condition Assessment

Inspection of the transformer's external condition: seals, surface treatment, ventilation, cooling, connections, and safety components. We assess its condition and provide a clear recommendation for next steps.

SEO

Inspection of bushings and tap changer

Bushings and tap changers are among the components most prone to failure. We inspect their condition, identify wear, and recommend action—whether cleaning, adjustment, or replacement.

SEO

Inspection of Instrumentation and Measuring Equipment

Inspection of temperature gauges, oil level gauges, pressure relief valve, and other monitoring and protection equipment.

SEO

Filtering and Replacement of Insulating Fluid

Where analysis indicates a need, we filter the oil to remove moisture and contaminants or replace the insulating fluid completely. Drying damp paper insulation is a practical measure that, when done correctly, can significantly extend service life. Used insulating fluid is handled in an environmentally responsible manner.

SEO

Cooling Capacity and Thermal Monitoring

In many cases, increased cooling capacity is a simple and effective way to reduce operating temperature—and extend insulation life. We assess the existing cooling system and recommend measures where relevant.

SEO

Documentation and History

All service visits are documented in writing. Over time, we build a service history for your facility—providing a better basis for maintenance planning, investment decisions, and regulatory compliance.

What Actually Fails – and Why It Matters

International transformer failure statistics show a clear pattern: the vast majority of serious failures occur in three components—windings, bushings, and tap changers. Failures in these components often cause downtime because they require extensive repairs and material lead times vary.

Tougher Operating Conditions

Transformers face increasingly demanding operating conditions and are becoming harder to replace.

Critical Components

The three components that cause the most failures are windings, bushings, and on-load tap changers.

Preventive Inspection

Early detection through regular condition monitoring is the most effective way to prevent prolonged downtime.

Service Locations

We provide service from two locations: Sykkylven in Sunnmøre (Western and Central Norway) and Kløfta near Oslo Airport Gardermoen (Eastern and Southern Norway). Both locations are permanently staffed and have fully equipped service teams.

SEO

Sykkylven Service Center

Do you need help, service, or a service agreement?

SEO

Kløfta Service Center

Do you need help, service, or a service agreement?

Find us here:

Address: Dyrskueveien 4, 2040 Kløfta

Contact Customer Service & Aftermarket